There are some significant limitations that you should know whether you are utilizing Project Online. These constraints apply paying little mind to whether you are appropriating Project Online independent from anyone else, or with other Office 365 plans.

Points of confinement in Project Online

To extract the best out of Project Online, there are a few points of confinement to how a lot of information (Data) you can practically store:  30,000 undertakings for every Project Web App webpage. – The task locales for these undertakings must not surpass 2000 sites in any one site gathering – and for best execution with enormous quantities of activities mean to have none of the project sites in the PWA site accumulation itself.  The initial portion of 25 GB for each Project Web App webpage. If you don’t mind see Tune Project Online Performance for more data. Note: The 25 GB limit for each Project Online database is discrete from the SharePoint Online cutoff points where Project Web App is empowered. The quantity of Project Web App locales inside an inhabitant is equivalent to the greatest number of SharePoint Site Collections permitted in an occupant. For Reporting, there are additional points of confinement to what number of single-value custom fields, of each kind, get put away in the detailing blueprint.

ms-project

Note: While you can make more custom fields than these breaking points, just these numerous custom fields will be incorporated into the OData feed. You are not ready to pick which of the fields are incorporated. Likewise for reporting, if an individual report’s source Excel document is bigger than 10MB, it can’t be invigorated in Excel. Rather, you can:  Revive the report utilizing Excel 2013.  Consider getting Power BI to expand that 10MB point of confinement and invigorate the report in Excel. File size limits for workbooks in SharePoint Online.

Deciding your PWA site use

An administrator can check the amount of your 25GB standard your PWA site is as of now utilizing through your PWA Settings.  Where to sign in to Office 365 for business with your administrator account and go to Project Online.  In Project Online, click the Settings symbol, and select PWA Settings.  On the PWA Settings page, in the Operational Policies area, select Additional Server Settings.  In the Project Web App utilization area, it will show your present Project Web App size in connection to your amount.  For instance: Project Web App size – Using 11MB of 25600MB accessible. Note: You need to be a Site Collection Admin for the PWA site in order to view the PWA site usage settings on the Additional Server Settings page.

Different contemplations

Past the information and custom field limits, there are few factors to consider. Changing domain isn’t bolstered On the off chance that you need to utilize your very own space, as contoso.com, rather than the default area, as contoso.onmicrosoft.com, you have to set up your space before adding clients to Project Online. Changing areas after you’ve included clients isn’t upheld.

Master page customizations

Altering or changing out the default ace page format can bring about sudden rendering or show issues and isn’t upheld.

Utilizing period images in your PWA site accumulation site address

Period images in the site name bit of a PWA site accumulation site address aren’t bolstered. This is designed when your administrator makes a PWA site in the SharePoint administrator focus.

ms-progect2

Note: Periods are permitted in PWA site names, however not in the site name segment of the site address. It takes more time to load more projects Since it requires some investment to stack more activities, somebody who approaches plenty of ventures may discover it takes more time to accomplish a few things, such as opening the Project Center or changing perspectives in the Resource Center. Consider setting up channels to eliminate the heap time for those clients who approach a lot of data. It takes more time to calculate multiple calendars At the point when a venture, assignment, or asset has its very own custom calendar, Project Online takes somewhat longer to figure the dates for the work going on in your association. Think about whether it bodes well to make a portion of the schedule changes on a more extensive scale, over your whole association. Your association speed matters If your association with Project Online is running gradually, it can take somewhat longer to accomplish things like burden reports with a great deal of information, or open, spare, and distribute a project through the Project Online Desktop Client.

 